(Solved)3. Given the project network and baseline information below

3. Given the project network and baseline information below, complete the form to develop a status report for the project at the end of period 4 and the end of period 8. From the data you have collected and computed for periods 4 and 8, what information are you prepared to tell the customer about the status of the project at the end of period 8?

2 B 8 8 D 12

0 A 2 0 0 0 0 12 F 15 LEGEND

0 0 2 6 8 8 4 12 0 0 ES ID EF

2 2 2 12 3 15 SL SL

2 C 7 7 E 10 LS DUR LF

2 2 2 2

4 5 9 9 3 12

End of Period 4

Task Actual % Complete EV AC PV CV SV

A Finished —— 300 400 —— ——

B 50% —— 1000 800 —— ——

C 33% —— 500 600 —— ——

D 0% —— 0 —— —— ——

E 0% —— —— —— —— ——

Cumulative Totals —— —— —— —— ——

End of Period 8

Task Actual % Complete EV AC PV CV SV

A Finished —— 300 400 —— ——

B Finished —— 2200 2400 —— ——

C Finished —— 1500 1500 —— ——

D 25% —— 300 0 —— ——

E 33% —— 300 —— —— ——

F 0% —— 0 —— —— ——

Cumulative Totals —— —— —— —— ——

https://d2vlcm61l7u1fs.cloudfront.net/media%2F1ee%2F1ee26ed4-a686-4198-8cd0-ebbc48a735e7%2Fimage

Expert Answer


Answer to 3. Given the project network and baseline information below. . .

OR


Leave a Reply

Your email address will not be published. Required fields are marked *